Start of production: revenue has started. In this stage for 76 days · 100% default win probability.
No custom fields yet.
Rank 1 of 37 eligible devices in our scoring of public specs. Strongest factor: spec fit — +1 class headroom (3x 300 MHz) · 6 MB flash / 1.109 MB SRAM against 4 MB / 0.46 MB required · I/O capacity — CAN-FD 8
Rank 2 of 37 eligible devices in our scoring of public specs. Strongest factor: spec fit — +1 class headroom (3x 300 MHz) · 6 MB flash / 1.109 MB SRAM against 4 MB / 0.46 MB required · I/O capacity — CAN-FD 8
Opportunity Scorer index for TC375TP · China · Electrification (EV). Illustrative, from public positioning — not a forecast.
TC375TP is only broadly positioned for Electrification (EV) (EV). A medium cost tier (proxy) against medium price sensitivity gives a price fit of 85%. Medium competitive pressure keeps 85% of that.
Only broadly positioned for Electrification (EV) (EV); illustrative Electrification (EV) demand in China is high.
From high compute class (proxy), EV/powertrain positioning (power-stage companion content). No internal attach-rate data.
Complexity from high compute class, mainstream generation: easier to support means fewer FAE hours per design-in.
Mainstream generation (TC3x). Electrification (EV) programs also reuse proven platforms, so an older generation is penalized less.
No tasks.
Ramp volumes are tracking to plan.
Battery management master: cell supervision via isolated daisy chain, contactor control, ASIL-D.