The customer is comparing parts against the requirement. In this stage for 61 days · 15% default win probability.
Rank 1 of 2 eligible devices in our scoring of public specs. Strongest factor: spec fit — compute matches (5x 400 MHz) · 20 MB flash / 6.1 MB SRAM against 16 MB / 6.1 MB required
Rank 2 of 2 eligible devices in our scoring of public specs. Strongest factor: spec fit — compute matches (6x 500 MHz) · 20 MB flash / 10 MB SRAM against 16 MB / 6.1 MB required · I/O capacity — CAN-FD 24
Opportunity Scorer index for TC49x · China · Electrification (EV). Illustrative, from public positioning — not a forecast.
TC49x is positioned specifically for Electrification (EV). A high cost tier (proxy) against medium price sensitivity gives a price fit of 60%. Medium competitive pressure keeps 85% of that.
Positioned specifically for Electrification (EV); illustrative Electrification (EV) demand in China is high.
From very-high compute class (proxy), EV/powertrain positioning (power-stage companion content). No internal attach-rate data.
Complexity from very-high compute class, leading-edge generation and a PPU toolchain: easier to support means fewer FAE hours per design-in.
Leading-edge generation (TC4x). Electrification (EV) programs also reuse proven platforms, so the newest generation's runway adds less.
Re-run the Navigator on the new requirement list
Overdue · 29 days ago
Agent
Reviewed how many control loops the integration controller must host.
One controller coordinating inverter, BMS and thermal management across the HX skateboard.