The customer has committed to the part for the program. In this stage for 66 days · 80% default win probability.
Rank 1 of 16 eligible devices in our scoring of public specs. Strongest factor: spec fit — compute matches (4x 300 MHz) · 12 MB flash / 1.656 MB SRAM against 8 MB / 0.71 MB required · I/O capacity — CAN-FD 20 vs 12 required, ETHERNET 1000 vs 1000 required
Rank 2 of 16 eligible devices in our scoring of public specs. Strongest factor: spec fit — compute matches (6x 300 MHz) · 16 MB flash / 2.75 MB SRAM against 8 MB / 0.71 MB required · I/O capacity — CAN-FD 12 vs 12 required, ETHERNET 1000 vs 1000 required
Opportunity Scorer index for TC3E7QX · Europe · Zonal E/E architecture. Illustrative, from public positioning — not a forecast.
TC3E7QX is adjacent to Zonal E/E architecture via Domain. A high cost tier (proxy) against medium price sensitivity gives a price fit of 60%. Medium competitive pressure keeps 85% of that.
Adjacent to Zonal E/E architecture via Domain; illustrative Zonal E/E architecture demand in Europe is high.
From high compute class (proxy), EV/powertrain positioning (power-stage companion content), zonal/domain positioning (transceiver and power-supply content). No internal attach-rate data.
Complexity from high compute class, mainstream generation: easier to support means fewer FAE hours per design-in.
Mainstream generation (TC3x). Zonal E/E architecture programs start new architectures, so production runway weighs heavily.
No tasks.
Purchasing confirmed the part for the program.
Central gateway routing CAN-FD, FlexRay and Ethernet between legacy domains and the new zonal backbone.