Stage change Samples / eval board → Design-in 60 days ago
NW-E2 front zone controller
Stage change Design-in → Design-win 66 days ago
NW-E2 central gateway
Email Sent the TC4x zone-controller comparison 66 days ago
Shared the compliance matrix export from RFQ Qualification.
NW-E2 front zone controller Lena Hartwig
Meeting Design-win review with purchasing 67 days ago
Purchasing confirmed the part for the program.
NW-E2 central gateway Jonas Albrecht
Meeting Zonal architecture workshop 96 days ago
Walked through backbone bandwidth and the power-distribution safety concept.
NW-E2 front zone controller Lena Hartwig
Stage change Samples / eval board → Design-in 103 days ago
NW-E2 central gateway
Stage change Technical evaluation → Samples / eval board 109 days ago
NW-E2 front zone controller
Stage change Technical evaluation → Samples / eval board 139 days ago
NW-E2 central gateway
Stage change RFQ / Lead → Technical evaluation 158 days ago
NW-E2 front zone controller
Stage change RFQ / Lead → Technical evaluation 175 days ago
NW-E2 central gateway
RFQ RFQ received: NW-E2 front zone controller 206 days ago
Front-left and front-right zone controllers for the NW-E2 platform: 1000BASE-T1 backbone, many CAN-FD and LIN legs, ASIL-D power distribution, secure OTA.
NW-E2 front zone controller Lena Hartwig
RFQ RFQ received: NW-E2 central gateway 211 days ago
Central gateway routing CAN-FD, FlexRay and Ethernet between legacy domains and the new zonal backbone.
NW-E2 central gateway Lena Hartwig